It was successfully inaugurated on June 6. While at the moment delivering sustainable energy to 30 households, the installation is meant to grant the supply for 100 homes in the village unconnected to the grid.
It consists of a solar energy station, a hybrid storage system and a smart grid signal transmitter, designed to optimize energy consumption. In order to preserve the project, local engineers and villagers have received the necessary information for on-site support and quality control. The whole planning and installation process was coordinated by the German Energy Agency (dena), within the framework of the Renewable Energy Solutions Programme. Funding came from the German Ministry for Economic Affairs and Energy.